• Seperable light trains facilitate the use in constricted space conditions
• "Plug Cam" to preview the uncured area of the liner
• Cable length up to 1000 ft
• Improved plug connection because of own developed plugs
• High system safety because of unique manufacturing penetration & development of all system relevant components
• Developed from the experience of the operators
• Use of high quality components from leading manufacturers grant a reliable operation
• Control of all curing relevant components via in drum integrated touch panel
• Modular extendable
• Many years of experience
The packer serves to close the liner two-sided. Thus a pressure over atmospheric pressure can be added.
The integrated generator ensures a autakes operate of the system; Cable drum with up to 300 meters of cable length and integrated PLC control.
http://www.ay-trenchless.com/